CSSE 376 -- Software Quality Assurance -- Spring 2007
Homework 9 Due:
Thursday, April 5
Purpose: practice system testing
1. Take your Version 1.1 of the Rosey Calendar source
code and modify it to reflect the results of the unit testing from
Homework 8. Call it your Version 1.2.
2. With your team specify system tests that will cover all of the features your Rosey Calendar Version 1.2.
3. Run your tests and create a log of the results.
4. Keep track of the time you spend on this assignment and report that at the top of the log.
5.
One member of the team should turn in the Version 1.2 source
code and the log to the ANGEL dropbox by midnight of the due date.