Weekly Review Form

ECOACH

JIANJUN ZHENG

Time Period:  11/26/2001 - 12/02/2001


The information given on this form represents my work on the project and is true to the best of my knowledge.


Artifact Work

Work Package # Role Artifact Name Sections / Modules C
r
e
a
t
e
A
d
d
D
e
l
e
t
e
E
d
i
t
C
o
r
r
e
c
t
A
s
s
e
m
b
l
e
Date Started Date Finished % Work Completed Time Period Hours Total Hours Deliverable(s)
5.5.2.3 Design Analyst System Architecture Top level description of the system.       X     11/27/2001 11/28/2001 100% 4 4 SystemArchitecture.zip
5.5.2.4 Design Analyst
  • Main Page Subsystem
  • Information Page Subsystem
Detailed Design/Main Page and Information Page X           12/01/2001 12/01/2001 100% 5 5 MainPage.zip

InfoPage.zip

                               
Totals 1 1 2 2             2 2 100% 7 7 2

Meetings

Work Package ID Date / Start Time Time Arrived Time Left Meeting Purpose
9.4.5.2 11/27/2001
6:00 PM
6:00 PM  7:15PM Worked with Software team to finalize the Design Document; Split up the Detailed Design.
Totals 1        

Other Work

Work Package # Role Bulleted List of Specific Tasks Date Started Date Finished % Work Completed Time Period Hours Total Hours
NA              
NA              
NA              
Totals                

Problems and Comments

NA

Managers and Leaders

NA

<The table entries should be filled in as follows if you are a manager or team leader:

>

Team Member Name Bulleted List of Progress Bulleted List of Goals