Weekly Review Form

ECOACH

JIANJUN ZHENG

Time Period:  11/12/2001 - 11/25/2001


The information given on this form represents my work on the project and is true to the best of my knowledge.


Artifact Work

Work Package # Role Artifact Name Sections / Modules C
r
e
a
t
e
A
d
d
D
e
l
e
t
e
E
d
i
t
C
o
r
r
e
c
t
A
s
s
e
m
b
l
e
Date Started Date Finished % Work Completed Time Period Hours Total Hours Deliverable(s)
5.3 Design Analyst System Architecture Top level description of the system.       X     11/25/2001 11/25/2001 100% 2 2 SystemArchitecture.zip
5.3 Design Analyst Level Two Flow Diagram (DFD) Data flow in more detailed form       X     11/20/2001 11/20/2001 100% 3 3 Level2DFD.zip
                               
Totals 1 1 2 2             2 2 100% 5 5 2

Meetings

Work Package ID Date / Start Time Time Arrived Time Left Meeting Purpose
9.4.3.5 11/16/2001
2:15 PM
2:15 PM  3:30PM Discuss data flow diagram, error handling, data storage format; Assigned new work to each design analyst.
9.4.3.6 11/19/2001
2:15PM
2:15PM 3:30PM Discussed design document; Divided the detailed design into pieces and assigned them to design analysts.
Totals 2        

Other Work

Work Package # Role Bulleted List of Specific Tasks Date Started Date Finished % Work Completed Time Period Hours Total Hours
NA              
NA              
NA              
Totals                

Problems and Comments

NA

Managers and Leaders

NA

<The table entries should be filled in as follows if you are a manager or team leader:

>

Team Member Name Bulleted List of Progress Bulleted List of Goals