| Work Package # | Role | Artifact Name | Sections / Modules | C r e a t e |
A d d |
D e l e t e |
E d i t |
C o r r e c t |
A s s e m b l e |
Date Started | Date Finished | % Work Completed | Time Period Hours | Total Hours | Deliverable(s) | |
| 5.2 | Design Analyst | Level One Data Flow Diagram (DFD) | To show how the data flow in this system | X | 11/09/2001 | 11/10/2001 | 100% | 3 | 3 |
Level1DFD.zip |
||||||
| 5.2 | Design Analyst | Level Two Flow Diagram (DFD) | Data flow in more detailed form | X | 11/10/2001 | 11/11/2001 | 100% | 5 | 5 | Level2DFD.zip | ||||||
| Totals | 1 | 1 | 2 | 2 | 2 | 2 | 100% | 8 | 8 | 2 | ||||||
| Work Package ID | Date / Start Time | Time Arrived | Time Left | Meeting Purpose | |
| 9.4.2.5 | 11/09/2001 / 2:15 PM |
2:15 PM | 3:30PM | Discuss System Architecture and User Interface Display that have been done; Discuss Requirements; Divide Design into small pieces and assign to each Design Analyst. | |
| Totals | 1 | ||||
| Work Package # | Role | Bulleted List of Specific Tasks | Date Started | Date Finished | % Work Completed | Time Period Hours | Total Hours | |
| NA | ||||||||
| NA | ||||||||
| NA | ||||||||
| Totals | ||||||||
NA
NA
<The table entries should be filled in as follows if you are a manager or team leader:
>
| Team Member Name | Bulleted List of Progress | Bulleted List of Goals |