Weekly Review Form

Reading Assessment

Keith Brumbaugh

Time Period:  3/11/2002 - 3/21/2002


The information given on this form represents my work on the project and is true to the best of my knowledge.


Artifact Work

Work Package # Role Artifact Name Sections / Modules C
r
e
a
t
e
A
d
d
D
e
l
e
t
e
E
d
i
t
C
o
r
r
e
c
t
A
s
s
e
m
b
l
e
Date Started Date Finished % Work Completed Time Period Hours Total Hours Deliverables
3.0.1.1 Design Analyst Design Document
  • Added my name to Design Document Template title section
  X         03/20/2002 03/21/2002 100% .1 .1
  • Design03212002.htm : My name is at the top of the HTML file and should be added to the main Design Document 
3.2.1.2 Design Analyst Design Document
  • Design Approach : Expanded on the design decomposition and modules used
  • Similar and Supporting work : Fixed a web site. Added examples similar works
  • Systems Architecture and Deployment: read over description and nothing was changed
  X X X X   03/20/2002 03/21/2002 90% 5 5.1
  • Design03212002.htm : the Design Approach, Similar and Supporting work, and Systems Architecture and Deployment info found in my html file should be added to the main Design Document 
3.2.1.3 Design Analyst Design Document
  • Main Page : Created a brand new Main page Diagram, the level 0 diagram
  • Guest Entry : Created a new diagram for the guest entry
  • Reading Tips : Created a new Diagram for the Reading Tips
    X X X   03/23/2002 03/26/2002 100% 7 12.1
  • Design03262002.htm : The Parts worked on go under the Detailed Design section, they should be numbered so you can find the corresponding order they go in. the .jpg files are the new diagrams. The files are Labeled according to where they belong, incase the page is unable to display them.
Totals 2 1 1 7             3 3   3 3 2

Meetings

Work Package ID Date / Start Time Time Arrived Time Left Meeting Purpose

9.1.2.1

3/19/2002 / 8:30AM 8:30AM 9:30AM General Team Meeting - Catch up on work

9.1.2.2

3/21/2002 / 8:30AM 8:30AM 9:30AM General Team Meeting

9.1.2.4

3/26/2002 / 8:30AM 8:30AM 9:30AM General Team Meeting
Totals 2        

Other Work

Work Package ID Role Bulleted List of Specific Tasks Date Started Date Finished % Work Completed Time Period Hours Total Hours
n/a n/a
  • n/a
n/a n/a n/a n/a n/a
Totals n/a n/a n/a n/a n/a   n/a n/a

Problems and Comments

n/a