Weekly Review Form

Reading Assesment

Keith Brumbaugh

Time Period:  3/11/2002 - 3/21/2002


The information given on this form represents my work on the project and is true to the best of my knowledge.


Artifact Work

Work Package # Role Artifact Name Sections / Modules C
r
e
a
t
e
A
d
d
D
e
l
e
t
e
E
d
i
t
C
o
r
r
e
c
t
A
s
s
e
m
b
l
e
Date Started Date Finished % Work Completed Time Period Hours Total Hours Deliverable(s)
3.0.1.1 Design Analyst Design Document
  • Added my name to Design Document Template title section
  X         03/20/2002 03/21/2002 100% .1 .1
  • Design03212002.htm : My name is at the top of the HTML file and should be added to the main Design Document 
3.2.1.2 Design Analyst Design Document
  • Design Approach : Expanded on the design decomposition and modules used
  • Similar and Supporting work : Fixed a web site. Added examples similar works
  • Systems Architecture and Deployment: read over description and nothing was changed
  X X X X   03/20/2002 03/21/2002 90% 5 5.1
  • Design03212002.htm : the Design Approach, Similar and Supporting work, and Systems Architecture and Deployment info found in my html file should be added to the main Design Document 
Totals 2 1 1 4             2 2   2 2 1

Meetings

Work Package ID Date / Start Time Time Arrived Time Left Meeting Purpose

9.1.2.1

3/19/2002 / 8:30AM 8:30AM 9:30AM General Team Meeting - Catch up on work

9.1.2.2

3/21/2002 / 8:30AM 8:30AM 9:30AM General Team Meeting - Catch up on work
Totals 2        

Other Work

Work Package ID Role Bulleted List of Specific Tasks Date Started Date Finished % Work Completed Time Period Hours Total Hours
n/a n/a
  • n/a
n/a n/a n/a n/a n/a
Totals n/a n/a n/a n/a n/a   n/a n/a

Problems and Comments

n/a